Projects

2013 Project

The Natural Living School has an amazing opportunity to be a part of the design and construction of a natural building built to code, next to the Ananda Village, one of the oldest and most established intentional spiritual communities in the world.  The dwelling will be built with round wood timber framing, bale-cob wall in-fill, an earthen floor, and natural cob plaster finishes. 

2013 Project 3

The  students at the Natural Living School will have an opportunity to participate in all aspects of the construction, from beginning to end.  The dwelling will be built in three phases.  Depending at  what stage the participant joins the group, will determine which aspects of the construction they will have the most hands on experience with.

In theory, all aspects of the construction will be covered, but in practice the participant will join the group at whatever stage the construction is in.  For the most in-depth coverage of information, in terms of hands on experience, the participant should sign up for the apprenticeship program lasting 6 months, from May until October.

2012 Project, The Bale-Cob Shop

We constructed a 200 square feet bale-cob shop.  This shop gave us the opportunity to practice round wood joinery  and fine tune the unforeseeable problems before we construct the larger structure mentioned above.  This project allowed the apprentices to see the construction of the building up to the installation of the roof.  In reality this was a perfect size building for a first time builder.  It is alway recommended to start small, and add on as time and money allow. 

Cleaning out the trench

Cleaning out the trench

Setting the Sonotubes that will hold up the timbers for the structure.

Setting the Sonotubes that will hold up the timbers for the structure.

Sonotubes are cut, forms are in, and ready for the cement bond beam as requested by the Engineer.

Sonotubes are cut, forms are in, and ready for the cement bond beam as requested by the Engineer.

Felling Cedar, after shopping in the forest for our timber posts.

Felling Cedar, after shopping in the forest for our timber posts.

Rock face is on, form boards are off, and 1st layer of the cob bond beam is on.

Rock face is on, form boards are off, and 1st layer of the cob bond beam is on.

starting to add the Straw bales and slip, as we cob the corners.

starting to add the Straw bales and slip, as we cob the corners.

The corner cedar post goes up.

The corner cedar post goes up.

The south side cedar post are going up.

The west side cedar post are up.

South Side Cedar Post are going up.

South Side Cedar Post are going up.

Lifting up cedar top plate on south side

Lifting up cedar top plate on south side

South View of the Balecob Shop.

South View of the Balecob Shop.

The joists are going on the balecob shop

The joists are going on the balecob shop

The King Cedar Post is up, the roof is on its way...

The King Cedar Post is up, the roof is on its way…

The ridge beam is up

The ridge beam is up

The rafters are going up.

The rafters are going up.

Rafters are just about done.

Rafters are just about done.

2011 Projects, The Bale-Cob Classroom

Balecob Classroom

starting the rock stem wall

Great day of rock stacking

Starting the first layer of the cob bond beam

Cob making for the cob stem wall

The Straw bales go up

Pond Liner for the Living Roof

Balecob Class room as of Dec. 2011

Making the scratch coat plaster for the 2012 apprentices.

Making the scratch coat plaster for the 2012 apprentices.

2012 Living With Spirit Group learning how to plaster.

2012 Living With Spirit Group learning how to plaster.

2012 Living With Spirit Plastering the Bale Cob Classroom

2012 Living With Spirit Plastering the Bale Cob Classroom

P1020763

Oliver cleaning off the rocks.

P1020778

2012 Apprentices and Living With Spirit finished the scratch coat plaster on the outside of the Bale-Cob Classroom.

Finished Scratch Coat plastering inside and out.  Closing the door until next year.

Miguel gives his okay as we finished scratch coat plastering inside and out. Closing the door until 2013 year.

P1020503

2010 Project, Spirit Pine Dojo

Spirit Pine Dojo 

Dojo post lifting

North side of Dojo

South side of Dojo

Dojo North Side close up

2010 Project

Cob Sauna

Kids help dig trench for foundation

The trench is almost ready

playtime!

Rock stacking for the stem wall

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 304 other followers

%d bloggers like this: